Small business IT

IT Disaster Recovery Plan for Small Business: RTO, RPO and Template

Write a simple IT disaster recovery plan: inventory systems, set RTO and RPO per system, plan backups and recovery order, and test on a schedule. Includes a fill-in template.

By EpiFive Editorial TeamReviewed/updated 9 min readHow we check articles
On this page

A small-business IT disaster recovery plan is a short document that says which systems matter most, how long each can be down (RTO), how much recent data you can afford to lose (RPO), how you will restore them and in what order, who does what, and how you will test it. This article gives you a method and a template you can fill in over an afternoon.

Who this is for

This is for owners and part-time IT administrators of small organizations with no dedicated continuity manager. By the end you will have a one-page system inventory with recovery targets, a backup and restore design that matches those targets, a recovery order, a contact list, and a test calendar.

It does not replace a full business continuity plan. Ready.gov, the US government's preparedness site, notes that the IT plan should be documented within the business continuity plan. If your business already has one, this becomes a section of it.

Key terms

Microsoft's Azure Well-Architected Framework defines the recovery metrics as follows:

TermDefinition
Recovery time objective (RTO)The maximum acceptable time that an application can be unavailable after an incident
Recovery point objective (RPO)The maximum acceptable duration of data loss during an incident
Mean time to recover (MTTR)The time taken to restore a component after a failure is detected

Those definitions come from a cloud architecture guide, but they apply to any business system. An RTO of four hours means you must be working again within four hours. An RPO of one day means that, in the worst case, you can lose up to a day of changes, so you need a backup at least that often.

Microsoft's guide also says that flows or workloads that are not thoroughly tested for recovery metrics should not have guaranteed targets, and that recovery targets can change as workloads are updated. Treat your targets as a hypothesis until a test proves them.

Step 1: Inventory your assets

Ready.gov's IT disaster recovery guidance begins with an inventory of hardware (servers, desktops, laptops and wireless devices), software applications and data. Build a table with one row per system:

SystemOwnerLocationData it holdsDependencies
Email and calendarOffice managerCloudMail, contactsInternet, DNS, identity
File storageIT adminCloud or file serverDocumentsIdentity, network
Accounting packageFinance leadCloud or serverLedgersDatabase, network
Line-of-business appOperations leadServerOrders, customersDatabase, network
Identity and sign-inIT adminCloudAccounts, MFAInternet
Network and Wi-FiIT adminOfficeConfigurationISP, power

Include the things people forget: your domain registrar login, DNS hosting, licence keys, firewall configuration and the password manager's emergency access.

Step 2: Rank systems and set RTO and RPO

Ready.gov says that IT recovery priorities should match the business function priorities from a business impact analysis, and that the recovery time of an IT resource should match the recovery time objective of the process that depends on it. In plain terms, ask the people who use each system: if this were unavailable, what stops, and from what point does it hurt?

Use tiers so you are not negotiating system by system. The values below are placeholders to show the structure. Replace them with numbers the business owner agrees.

TierMeaningRTO (example)RPO (example)
1Business stops without itSet by owner, for example hoursSet by owner, for example under an hour
2Work is slowed but possibleSet by owner, for example one daySet by owner, for example one day
3InconvenientSet by owner, for example several daysSet by owner, for example a week

Write the target next to each system in your inventory and note who approved it. Be realistic about cost: shorter RTO and RPO values need more infrastructure and more money, so the owner should see the trade-off.

Step 3: Design backups to meet the targets

Backups are what let you meet the RPO, and restore speed is what decides the RTO.

Ready.gov's data backup guidance covers identifying what data to back up, selecting and implementing backup procedures, scheduling and conducting backups, and periodically validating that data has been accurately backed up. It also says the business impact analysis should evaluate the potential for lost data and define the recovery point objective, and that the recovery time of an IT resource should match the recovery time objective of the process that depends on it. In practice that means comparing restore times with your RTO, which is the check most often missed. If a backup takes ten hours to restore and your RTO is four, the backup does not meet the target.

CISA's ransomware guide adds the security side:

  • Maintain offline, encrypted backups of critical data. Many ransomware variants attempt to find and then delete or encrypt accessible backups.
  • For cloud environments, consider whether a multi-cloud arrangement helps if all accounts under one vendor are affected.
  • Immutable storage can protect data without a separate environment, but CISA advises using it with caution because misconfiguration can be costly.
  • Regularly test the availability and integrity of backups in a disaster recovery scenario.

Practical rules that follow from this:

  1. Each Tier 1 system has a backup at an interval no longer than its RPO.
  2. At least one copy of that backup is offline or otherwise out of reach of an attacker who controls your network accounts.
  3. Backups are encrypted, and the key is stored separately from the backup.
  4. Someone is responsible for checking that jobs succeeded.

Related guides: offsite backup from a Synology NAS, Azure Backup for virtual machines and PostgreSQL backup with pgBackRest.

Step 4: Plan the recovery order and the rebuild

CISA recommends keeping "golden images" of critical systems (a preconfigured operating system and applications) that can be quickly redeployed, keeping spare hardware for rebuilding systems, and setting restoration priorities in advance from a predefined critical asset list that includes systems critical to health and safety or revenue.

Write the order out as numbered steps. A typical small-office order is:

  1. Network, internet connection and power, since everything else depends on them.
  2. Identity and sign-in, so people can authenticate.
  3. Communication: email and chat, so you can coordinate.
  4. Tier 1 line-of-business systems and their data.
  5. File storage.
  6. Remaining systems by tier.

Ready.gov also advises standardising hardware, which makes replication and reimaging easier, and keeping copies of software so programs can be reinstalled on replacement equipment. Store installers and licence information somewhere you can reach during an outage.

Step 5: People, communication and access

A plan fails if nobody knows who is in charge or the contact list is on the dead file server. Document:

  • Who declares an incident and who leads recovery, with a named deputy.
  • Contacts for staff, key customers, suppliers, the internet provider, the software vendors and your insurer, as phone numbers that do not depend on your systems.
  • A communication template for staff and customers describing what is affected and when the next update is due.
  • Where the plan is stored. CISA advises keeping a hard copy and an offline version of the incident response plan.
  • Emergency access accounts for your cloud services, with credentials stored securely and tested.

Step 6: Test on a schedule

Ready.gov advises testing the plan periodically to make sure that it works, and periodically confirming that data has been accurately backed up. It points to NIST Special Publication 800-84, Guide to Test, Training, and Exercise Programs for IT Plans and Capabilities, for structured testing.

Set a schedule you can keep. One workable pattern:

TestWhat you doFrequency (your choice)
Restore checkRestore a sample file, mailbox item or database copy to a test locationRegular, such as monthly
System restoreRebuild one Tier 1 system from backup in an isolated environment and time itAt least once a year
Tabletop exerciseWalk through a scenario with the team, such as a ransomware infection or a failed serverAt least once a year
Contact checkCall the people on the contact listTwice a year

Record the time each test took and compare it with the RTO. If a test shows the target is unrealistic, change either the design or the target and record the decision.

Template

Copy the following into a document and fill in every field.

IT DISASTER RECOVERY PLAN - [Business name]
Version / date / owner:
 
1. SCOPE
   Locations and systems covered:
 
2. SYSTEM INVENTORY AND TARGETS
   System | Owner | Tier | RTO | RPO | Backup method | Backup location | Restore time (tested)
 
3. RECOVERY ORDER
   1.
   2.
   3.
 
4. ROLES
   Incident lead / deputy:
   Technical recovery:
   Communications:
 
5. CONTACTS (phone numbers that work offline)
   Staff:
   Vendors and ISP:
   Insurer:
 
6. BACKUP RULES
   Frequency per tier:
   Offline / encrypted copy location:
   Who checks job results, and how often:
 
7. TEST LOG
   Date | Test type | Result | Measured time | Fixes needed
 
8. PLAN STORAGE
   Hard copy at:
   Offline copy at:

Troubleshooting a plan that does not work

  • Restore takes longer than the RTO. Reduce the amount to restore at once, restore the highest-priority data first, change the backup design, or agree a longer RTO with the owner.
  • Backups succeed but restores fail. Test restores more often, check encryption keys and keep installers for the backup software itself.
  • Nobody can find the plan during an outage. Print it and store an offline copy.
  • The inventory is out of date. Add updating it to your change process, for example when you add a system or leave a supplier.

Checklist

  • Inventory complete, including logins, licences and DNS.
  • Tier, RTO and RPO set and approved for every system.
  • Backup interval at or below RPO for Tier 1 systems.
  • One offline, encrypted copy of critical data.
  • Restore time measured and compared with RTO.
  • Recovery order written down.
  • Roles and contacts recorded, with a hard copy of the plan.
  • Test calendar set, and results logged.

References

Questions people ask

What is the difference between RTO and RPO?

Microsoft defines the recovery time objective (RTO) as the maximum acceptable time that an application can be unavailable after an incident, and the recovery point objective (RPO) as the maximum acceptable duration of data loss. RTO is about downtime and RPO is about how far back your last good copy can be.

How often should I test a disaster recovery plan?

Ready.gov advises testing the plan periodically to make sure it works and periodically confirming that data has been backed up accurately. The exact frequency is your decision; a sensible approach is to restore a sample regularly and run a full scenario exercise on a schedule you can keep.

Are backups enough to count as a disaster recovery plan?

No. Backups are one part. A plan also lists critical systems, recovery targets, the order of restoration, who does what, how people are told, and where the documentation is kept when your systems are down.

Should backups be stored on the same network?

CISA's ransomware guide advises maintaining offline, encrypted backups of critical data because many ransomware variants try to find and delete or encrypt accessible backups. Keep at least one copy separate from the systems it protects.

Disaster recoveryRTORPOBackup
  1. Do Small Businesses Need Google Workspace Backup? What Google Keeps and Doesn't

    What Google Workspace keeps after deletion, how long admins can restore Gmail and users, why Vault is not a backup, and how to decide whether a small business needs a separate backup.

  2. Microsoft 365 Backup for Small Businesses: Native Retention vs Backup

    What Microsoft 365 keeps by default for Exchange, SharePoint and OneDrive, where those protections end, and when a small business should add Microsoft 365 Backup or a third-party backup.

  3. NAS vs Cloud Storage for a Small Business: Cost and Risk Compared

    Compare a NAS with cloud storage such as OneDrive and SharePoint for a small business: what each costs over time, how each fails, and a simple way to decide.

  4. Synology NAS Offsite Backup with Hyper Backup to Cloud Storage

    Set up an offsite copy of your Synology NAS with Hyper Backup and Azure Blob Storage: prepare the storage account, protect the key, and plan versions and restores.

  5. Make UPI, WiFi and vCard QR Codes with a Logo: EpiFive QR Code Generator

    How to make styled QR codes for links, UPI payments, WiFi and contacts with EpiFive QR Code Generator, the free MIT-licensed generator that runs in your browser, and how to self-host it.

  6. Cyber Insurance Security Requirements Checklist for Small Businesses

    A control-by-control checklist to prepare for a cyber insurance application or renewal: MFA, backups, EDR, patching, admin accounts and an incident response plan, with evidence to collect and CISA sources.